Dunor Energía contrata a OCA Global | OCA Global
Select country:

Spain

ES / CA / EN

Andorra

ES / EN / CA

Saudi Arabia

ES / EN / عر

Brasil

ES / EN / PO

Chile

ES / EN

Colombia

ES / EN

Egypt

ES / EN

Arab Emirates

ES / EN

India

ES / EN

Morocco

ES / EN / FR

Mexico

ES / EN

Panamá

ES / EN

Peru

ES / EN

Portugal

ES / EN / PO

Romania

RU / EN

South Africa

ES / EN

Ukraine

ES / EN

Italia

ES / EN

Come back
#Press release

Dunor Energía hires OCA Global

29.10.2018

The company Dunor Energía has contracted OCA to carry out the sampling and physicochemical analysis of natural gas for gas turbines. This analysis will be performed at the Empalme II combined cycle power plant in the state of Sonora. The first visit will take place in June 2018; the service will consist of two visits to the plant.