Realizamos la inspección técnica de obra en el par... | OCA Global
Select country:

Spain

ES / CA / EN

Andorra

ES / EN / CA

Saudi Arabia

ES / EN / عر

Brasil

ES / EN / PO

Chile

ES / EN

Colombia

ES / EN

Egypt

ES / EN

Arab Emirates

ES / EN

India

ES / EN

Morocco

ES / EN / FR

Mexico

ES / EN

Panamá

ES / EN

Peru

ES / EN

Portugal

ES / EN / PO

Romania

RU / EN

South Africa

ES / EN

Ukraine

ES / EN

Italia

ES / EN

Come back
#Press release

We performed the technical inspection of the construction site at the La Loma photovoltaic park, Colombia

28.07.2022

OCA Global Colombia has been awarded the contract for the technical inspection of the construction work offered by Enel Green Power at the La Loma photovoltaic park in the municipality of El Paso, Cesar, the largest solar park under construction in the country.

The contract, with a duration of 16 months, consisted of the execution of technical site inspection activities, as support in the supervision of the construction of a photovoltaic plant, consisting of 462,600 solar modules and distributed over an area of 388.5 ha.

The supervision team has had highly experienced professionals, who have performed multidisciplinary work, articulating various fields of engineering such as electrical, mechanical, electromechanical and civil, among others, to ensure that the client's requirements were met in terms of quality and timeliness.