The new contract with Inti Punku for the Shop Inspection service allowed us to be part of the work being carried out at Jorge Chávez International Airport, Lima Airport Partners (LAP). This consortium is working on the design and construction of the airport's new passenger terminal, which will come into operation in 2025.
On the other hand, during this same year we were awarded a contract with Terpel Aviación to carry out a soil study, contributing our grain of sand with the environmental controls that are being carried out at the airport.